École Connaught Community School Replacement Project 

See a new flythrough video posted on November 8, 2016.

August 24, 2016 Update.

Approval for the replacement of Connaught School was provided in the provincial 2014/15 budget. Planning for the new school has begun in earnest to target a Fall 2017 completion and opening.

Stage 1 Facility Study Submission - provided as part of the initial application to the Ministry for this project

School Community Planning Session (October 1, 2014)

On October 1st a planning workshop was conducted with the school community to discuss aspects of the upcoming project and key elements specific to the existing school site.  Participants developed six site scenarios for further consideration by the school planning team.  Two options will be narrowed down for further consultation with the Connaught Community in late October.  The School Community Council also presented survey information they collected prior to the meeting. Regina Public Schools is providing this link to their survey results.   

A summary of the information collected at the October 1 community planning meeting is included in this document along with the project schedule.

Looking for the initial proposed designs, the Hub Hall and Hub Heart? Follow this link.

Community Consultation

Thank you for helping us design the new Connaught!

Follow this link to read about the Thoughtexchange consultation process.

Student Input

There are as many "teachable moments" in the design and construction of a school as there are student ideas about how their school should be designed.  Here are some examples of how Connaught students are participating. Follow this link

Community Feedback and Schematic Design Presentation

The results of the Thoughtexchange conversation are now available for review.  Follow this link.  This feedback informed the final schematic design that was shared at a  December 18th, 2014 community meeting held at the Cathedral Neighbourhood Centre 2900 13th Avenue. Review the Schematic Design Report here.

Detail Design Approved

In July 2015, the design detail for the new school was approved allowing the project to move to the detailed construction and tender document stage.   Work in this area will continue with a targeted completion and possible contract tender in late fall. More information (including additional illustrations) on the design and the methodology used to create the final design can be found at this link  and by referring to the current drawings, renderings, floor plans and elevations.

Sod Turning Event

On February 29, 2016, the school division, the Ministry of Education, students and the community celebrated a sod turning for the new school. Read more details here.

You can also read the Government of Saskatchewan news release here.

 

 

 

 

 

 

 

 

 

 

 


Joint-Use Schools Project

The three new joint-use schools between the Public and Catholic school divisions will offer options for shared programming opportunities for students and share maintenance costs between divisions.   Preliminary planning and designs have progressed on this project which are planned to be opened for the 2017/18 school year in September, 2017.  More information on Regina Public Schools status can be found here as information becomes available. Read the Joint-Use Schools Media Release from the Government of Saskatchewan.

Read the story about the project sod turning in September 2015.

Read about new live construction webcams here.